FTTP Business Broadband for Leeds & Yorkshire
Clear Faces and Clean Sound on Your 3pm Teams Call
Up to 1.8Gbps download, installed by a team just down the road. When you ring, a Leeds engineer picks up in about 8 seconds.

What Is Fibre
to the Premises?
Business FTTP, Full Fibre All the Way In
Fibre to the premises (FTTP) is full fibre business broadband. Fibre optic cable runs from the exchange all the way into your building. Some of the route may run along telegraph poles.
With no copper on the way, business FTTP speeds stay close to the top figure: up to 1.8Gbps download and about 300Mbps upload.
Those speeds aren’t guaranteed. If your business needs a guaranteed speed, look at a leased line.
Business Grade, So Your Full Fibre Holds Up at 3pm
Cheap broadband and business broadband can have the same headline speed. The difference is how many people share the line, called contention.
Cheap broadband is often shared at ratios in the hundreds, sometimes 200:1. So when kids get home from school at 3pm, it slows right down, and your cloud systems and calls start dropping.
Our full fibre is business grade, shared at 7:1 to about 30:1, so it holds up at busy times.
We see this a lot, and swapping to a business-grade line at the same headline speed fixes it. Here’s how contention works.
About 85% of Leeds City Centre Can’t
Get Full Fibre Yet.
Can You?
Full fibre isn’t everywhere yet. In the LS1 postcode, Leeds city centre, about 85% of addresses still can’t get it.
And sometimes the address records are simply wrong.
In summer 2026, a business just round the corner from our office asked us for full fibre. Openreach’s address records showed only slow Standard Fibre at their building.
Yet the buildings on both sides had full fibre, from a telegraph pole right there. Large desk-based providers had told them it couldn’t be done.
So we got in the car. We checked the neighbours, went back to the supplier to get the address record corrected, and installed full fibre.
That took a while, so we took a 5G router to their office first. Once we’d tested the speed on site, their team worked over 5G until the fibre went in.
Once their full fibre was in, they moved their phone system and a few other services to us too.
If full fibre isn’t built at your address yet, FTTP on Demand is sometimes possible. See the FAQs below.
4 Steps to Full Fibre,
Fitted in 6–9 Working Days
1
Your call
An engineer rings you the same working day to book your free site survey.
Want to talk sooner? Ring 0113 208 3303 and an engineer picks up in about 8 seconds, Monday to Friday, 9am to 5pm.
2
Your free site survey
An engineer checks whether full fibre really reaches your building, and the speed it’ll get.
Address records can be wrong, so we look for ourselves.
3
Your quote
You see every cost before you sign. Installation charges vary by supplier, and we confirm yours up front.
Contracts usually run 12 months.
4
Your install
Openreach fits it, usually in 6–9 working days. Paid fast-track can shave a couple of days, but it isn’t guaranteed.
We book the install for you and keep you updated until your line is live.
Full Fibre
Business Broadband
From About £25 a Month + VAT
Full fibre costs about £25–£80 a month + VAT, depending on the speed you choose. Contracts usually run 12 months.
Installation charges vary by supplier, and we confirm them before you sign. Your full fibre runs on the Openreach and Virgin Media networks.
Taking phones or IT from us too? Ask about bundle pricing. And for every subscription, we plant a tree.
Your Full Fibre Drops
at 10:02.
We Ring You by 10:05
We ping every broadband connection we look after once a minute. If yours is still offline after 2–3 minutes, we ring you and run the basic checks.
Within 10–15 minutes, any supplier fault is with the supplier, and we chase them by phone. You get updates even when there’s no news.
For issues within our control, tickets typically get a response and a fix within 1 hour.
Our team works Monday to Friday, 9am to 5pm, and we pick up anything out of hours first thing on the next working day. See the full timeline.
FTTP vs SOGEA and FTTC:
Up to 1.8Gbps or Up to 80Mbps?
Standard Fibre (SOGEA) replaced FTTC, with the same speeds, so this comparison covers both. The difference is the last stretch to your building.
| FTTP | Standard Fibre (SOGEA) | |
|---|---|---|
| Route to your building | Fibre all the way | Fibre to the street cabinet, copper the last stretch |
| Download | Up to 1.8Gbps | Up to 80Mbps, less on long lines |
| Upload | About 300Mbps | Up to 20Mbps |
| Install time | 6–9 working days | At least 10 working days |
| Contract | Usually 12 months | Usually 12 months |
Weighing up a leased line instead? The leased line page compares it with FTTP.
FAQs
Find Out If Your Office Can
Really Get Full Fibre
Your survey checks your address properly, including the neighbours if the records look wrong.
An engineer rings you the same working day to book it. Or ring 0113 208 3303, and an engineer picks up in about 8 seconds, Monday to Friday, 9am to 5pm.
Comparing every option? See business internet in Leeds.
You’ll find us on the 2nd floor of Topcliffe Mill in Morley. If your office is in Leeds, your engineer is close by. Clients across Yorkshire are looked after from here too, in places like Wakefield, York, Bradford, Huddersfield, and Harrogate (to name a few).
- Email: enquiries@optionbox.co.uk
- Phone: 0113 208 3303
- Address: 2nd Floor Topcliffe Mill, Topcliffe Lane, Morley, Leeds, LS27 0HL
Book a Free Site Survey
An engineer rings you the same working day.


